Home

The_Team

Contact_Us

Feedback

FAQ

Glossary

NHS_Links

Help

   
   
Health Investment Plan News - 19 August 2005

   

INFORMATION 

A Brief Overview
A brief introduction to the health plan

FITN
Final Invitation to Negotiate

PITN
Preliminary Invitation to Negotiate

Public Consultation
The document, feedback and frequently asked questions

Outline Business Case
Copies of the OBCs and sketches of the hospital

Office Location
How to get to the Project Office

DATA

Peterborough's Hospitals
Photographs of the two hospital sites in Peterborough

 

Hospital Ward Design Complete

The design layout of the wards in the new hospital have been completed. The architects have developed a design that will provide patients with a high level of privacy and dignity, and provide staff sufficent space to deliver the best possible care.

The new ward design
(Click on the image to see a larger version)

The entrance to the ward is at the top right immediately next to the reception desk and adjacent to the interview room and ward offices. The patient area is divided into three separate zones, one 7-bed unit and two 11-bed units. This allows patients with differing needs to be treated in the most appropriate environment.

Over 50% of the beds are in single rooms, one of which includes a lobby so it can be used as an isolation room. All the bedrooms have their own wheelchair accessible en-suite with a WC, basin and shower. There is an additional bathroom and WC suitable for use by an independent wheelchair user.

The ward design also incorporates the new cruciform 4-bed bay. The architects on the project, Nightingales Associates, have been studying the benefits of this layout for a number of years. It provides greater separation between patients and more space for ward staff to use hoists and other important equipment. It also allows the creation of two quiet areas where patients can sit with relatives or have their meals.

 

Working together to deliver a health service for the 21st century 

 SEARCH



 LATEST NEWS

Health Investment Plan Approved
2 July 2007

ECH Planning Application Approved
2 February 2006

Aarchaeological Investigations Completed
11 November 2005

Independent Tester Contract Notice Published
27 October 2005

Planning Application Displays
3 October 2005

New hospital ward design agreed
19 August 2005

New mock-ups take shape
11 July 2005

Design Layouts on View
11 March 2005

News archive
Links to these and other news stories

Copyright © 2001 - 2004 Peterborough and Stamford Hospitals NHS Foundation Trust.
All rights reserved.